Showing items 1 to 86 from total of 86 items. Ordered by photo # descending.
Photo # ![]() |
Photo | Caption | Categorisation |
---|---|---|---|
162792 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162791 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162790 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162789 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162788 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162787 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162786 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162785 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
162784 | ![]() | Slow down traffic past school – 20 mph – www.20splentyorg | Temporary closure: Problem closure |
159214 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159213 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159212 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159211 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159210 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159209 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159208 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
159207 | ![]() | Slow down traffic past school - 20 mph - www.20splenty.org | Temporary closure: Problem closure |
154807 | ![]() | Ashleworth Hub. Post Office. | Other: Misc general |
152283 | ![]() | Existing lack of footway along Walton Cardiff Lane between Ashchurch Road and Walton Cardiff. A footway could be provided along part of the highway utilising some of the Town Council owned Derek Graham Memorial Play Area site. | Track: Problem track |
152282 | ![]() | There is currently a gap in the shared footway/cycleway along Ashchurch Road alongside Knights Way. The verge in this location is owned or managed by local authorities and there should be sufficient space for a footway and cycleway to be provided between Pyke Road and the end of Canterbury Lees whilst maintaining green space and planting areas. | Cycleway: Problem cycleways |
148515 | ![]() | Although the footway along Church Street is relatively wide as the town becomes busier more space is required. Some road space utilised for inappropriate on-street parking on the north western side of the carriageway could be reallocated for pedestrians and cyclists. This would potentially help both traffic flow and physical distancing. | Track: Problem track |
148514 | ![]() | There is no footway along this stretch of Stoke Road (C86). Stoke Road is an unlit rural road operating with the National Speed Limit. Although available space in the highway boundary is limited consideration could be given to providing a footway along this stretch of road connecting Tredington to the Odessa/The Hoo and providing safe pedestrian access for the properties located at the south of the Parish of Tewkesbury. | Track: Problem track |
148454 | ![]() | Narrow pavement on eastern side of Gloucester Road. Change would require reallocation of road space for use by pedestrians or cyclists unless land was taken outside the available highway boundary. | Track: Problem track |
147877 | ![]() | This junction is not safe for children to access the playgroup, skatepark, BMX track & open space, NCN 45 cycle network. Needs controlled crossing or highway measures to slow vehicles approaching this junction down on the approach to the mini-roundabout. | Temporary closure: Problem closure |
147875 | ![]() | We currently have barriers which prevent trailer bikes from accessing the nearby new Churchdown Surgery and the south of Churchdown, there is plenty of space to open up, this is on the NCN 45 route. We are cutting off two parts of Churchdown by not making this more accessible to all vulnerable users. Link up this area. | Cycleway: Problem cycleways |
147871 | ![]() | The continuation of this quiet residential route to join with the cycleway through Barnwood Business Park & connecting with Longlevens would be ideal for young people accessing senior schools in Churchdown and employees accessing the main employment areas of Barnwood and Gloucester Business Park. | Cycleway: Problem cycleways |
147869 | ![]() | Ash Path is not properly surfaced or lit at nights, yet it is the key route for young people accessing senior schools in Churchdown from Innsworth & Longlevens. This route is rutted and muddy for much of the year. | Cycleway: Problem cycleways |
147867 | ![]() | Needs cycleway for young cyclists using the pavements currently on Pirton Lane to access the 7 schools under a 2 mile radius. | Cycleway: Problem cycleways |
143330 | ![]() | This bridge is dangerous with narrow cycle lanes painted on the road and a narrow footpath all in a terrible state of maintenance. There is plenty of space to engineer acceptable solutions | Cycleway: Problem cycleways |
141881 | ![]() | Coronavirus Covid-19 Social Distancing Water Filled Red and White Barriers in High Street, Tewkesbury. | Road environment: Infrastructure road |
139541 | ![]() | Widen footway between Cheltenham and Uckington Village Centre, to enable cyclists to access Elmstone Hardwick and Stoke Orchard using quiet country lanes | Cycleway: Problem cycleways |
134416 | ![]() | Inconsiderate road users. Cycle priority needed. | Cycleway: Problem cycleways |
134413 | ![]() | Too much traffic with no consideration for cycles. Cycle priority needed. | Cycleway: Problem cycleways |
134407 | ![]() | Too many parked cars and too much through traffic for safe cycling. One way traffic system with parking on one side of the road only would make for better cycling and reduced emissions. | Cycleway: Problem cycleways |
132748 | ![]() | Pavement on one side disappears meaning pedestrians need to share one pavement and have to step into the road to avoid each other. Continue the pavement so there are pavements both sides. | Track: Problem track |
126405 | ![]() | Make 30mph. Popular lane with cyclists but 50mph means fast cars putting a lot of potential cyclists off. | Cycleway: Problem cycleways |
125107 | ![]() | No ferry from Forthampton at the minute to Tewkesbury. | Other: Misc general |
125089 | ![]() | Fingerpost with clear large typeface destinations. | Destination: Infrastructure destinations |
119722 | ![]() | Here there is a diversion from the road traffic. It has a few potholes at this end. Twigworth is in need of a Segregated Bicycle Path. | Road environment: Infrastructure road |
119720 | ![]() | Side Street 15mph Sign. [private roads can have non-standard speed limits] | General sign/notice: Good practice signs |
118429 | ![]() | A clear cycle path needs to be created the present one is very dangerous and intermittent | Cycleway: Problem cycleways |
118423 | ![]() | The cycle path stops and this part of the road gets very busy | Cycleway: Problem cycleways |
118422 | ![]() | Reduce speed limit to 30 mph. There is no pavement, and this road it used a lot by cyclists and pedestrians. Doubt there is room for proper cycling infrastructure but something needs to be done to control traffic urgently before a tragedy occurs. | Cycleway: Problem cycleways |
118421 | ![]() | It is in need of urgent repairs and to be widened | Cycleway: Problem cycleways |
118095 | ![]() | Cycling between Cheltenham & Gloucester is along here and traffic very busy in rush hours. A dedicated shared cycle/pedestrian way could easily be incorporated in wide verges and on bends. | Cycleway: Problem cycleways |
118088 | ![]() | No pavement here and yet a popular route for walkers & cyclists.... especially if you want to commute to Gloucester via Route 41 which goes around airport. Pathways should be improved as winter months there is no lighting and traffic too fast along Badgeworth lane. | Track: Problem track |
118081 | ![]() | Often overgrown and used by cyclists as road too dangerous.... this whole road from island with A417 to Brizen fields needs rethinking as more of a shared cycle and pedestrian pathway. New housing estates are increasing traffic flow which is increasing the danger to cyclists and walkers alike. | Track: Problem track |
118073 | ![]() | Often overgrown and used by cyclists as road is too dangerous. | Track: Problem track |
117676 | ![]() | Very narrow footpath with no alternative on the other side of the carriageway. | Track: Problem track |
116925 | ![]() | Fully segrated and protected cycle path in both directions needed on Up Hatherley Way. Ridiculous recent scheme which removed grass to widen only a small section of pavement and paint cycles on the road is a joke. | Cycleway: Problem cycleways |
116299 | ![]() | Safer cycling on the A46 Brockworth to Cheltenham needed | Cycleway: Problem cycleways |
116263 | ![]() | A cycle route between b/c and Cheltenham is badly needed to avoid the treacherous evesham road. | Cycleway: Problem cycleways |
116253 | ![]() | The entire Shurdington Road is a well used route for cyclists, and road markings should be added to indicate it as a cycle route; along with dedicated cycle paths along sections where possible. | Cycleway: Problem cycleways |
116067 | ![]() | Slippery Slope and loose gravel which is not very good to use a Bicycle upon. Tarmacadam needed at the Thomas Telford Bridge. | Cycleway: Problem cycleways |
115664 | ![]() | Rough road and grit on very narrow path. Newent Road, Highnam. | Road environment: Problem road |
115663 | ![]() | A Silly Scaffolding Barrier Obstruction to hinder Bicycle use. Sustrans National Cycle Network NCN 42. | Obstruction: Problem obstructions |
115529 | ![]() | The National Cycle Network (NCN) 41 is signed on different ways in Churchdown. Here is another Barrier to hinder people on Bicycles. | Obstruction: Problem obstructions |
115528 | ![]() | Social Distancing with the Coronavirus Covid-19 means that more space is needed for people. The Shared Use Bicycle Path in Churchdown gets narrow at the junction because of the left hand traffic filter lane. | Cycleway: Infrastructure cycleways |
115524 | ![]() | Another Awful 'A' Frame by the gate which can be Locked. | Obstruction: Problem obstructions |
115500 | ![]() | Bus Halt Bypass for Bicycles. This is also known as a Floating Bus Stop. Cheltenham Road East, Churchdown. | Dutch-style cycleway: Good practice dutchcycleways |
115499 | ![]() | After the barrier followed by a rough and steep BMX track. It is supposed to be for Bicycles but is really dire. | Obstruction: Problem obstructions |
115498 | ![]() | Too steep and as rough as hell. The surface is an utter mess with dust and gravel. The gravel is loose, sharp and large. The Bicycle had to be walked. | Cycleway: Problem cycleways |
115497 | ![]() | An Awful 'A' Frame on National Cycle Network (NCN 41). Abysmal 'A' Frame which is so bad there is reflector stickers on it which suggests that at night it is a nightmare obstruction and danger! | Obstruction: Problem obstructions |
115495 | ![]() | Coronavirus Covid-19 Warning on the Gate and the Awful 'A' Frame. This is in Churchdown. | Obstruction: Problem obstructions |
115351 | ![]() | This road is generally a Rat Run. | Road environment: Problem road |
115350 | ![]() | Shared Use Two Way Bicycle Path (from Gloucester to Cheltenham) becomes a One Way Cycle Lane near the junction. A Bicycle user (from Cheltenham to Gloucester) has to either cross two lanes of traffic or go the wrong way on the Cycle Lane. | Cycleway: Problem cycleways |
115349 | ![]() | Shared Use Bicycle Path. | Cycleway: Infrastructure cycleways |
115319 | ![]() | The Worst Dangerous Obstruction a Bicycle Path in Gloucestershire. The Shared Use Bicycle Path does not have the legal recommended width of over 150cm width for a Single Lane Bicycle Path. This Bicycle Path is two way even so, with this Bus Halt Flag being totally dangerous especially at Night it can not been seen. Cheltenham Road East, Staverton. | Obstruction: Problem obstructions |
114899 | ![]() | Shared Use Path next to a Bus Lane which allows Motorbikes and Bicycles. | Cycleway: Infrastructure cycleways |
114898 | ![]() | A Needless Obstruction made from old Scaffolding next to the Gate. | Obstruction: Problem obstructions |
114896 | ![]() | The Telford Bridge spanning the River Severn at Over. It was built from 1825 to 1828. Used by traffic until 1974. Bicycles and Walkers only can cross over here. | Cycleway: Infrastructure cycleways |
114595 | ![]() | Here is the end of the Shared Use Bicycle Path with Cycle Parking across the road. | Cycle parking: Infrastructure cycleparking |
114594 | ![]() | Shared Use Bicycle Path with a Slow for a side street. The design is poor as the traffic on the side street should be traffic calmed and slow for the Bicycle. | Cycleway: Problem cycleways |
114593 | ![]() | The Shared Use Bicycle Path in Longford Lane finishes on the north side of Longford Lane. Longford Lane is in Tewkesbury Borough Council and the borough boundary into Gloucester City Council is over the bridge. People on the Bicycle have to cross the border on the south side of the bridge. | Obstruction: Problem obstructions |
114592 | ![]() | Bicycle Parking | Cycle parking: Good practice cycleparking |
114591 | ![]() | Bicycle and Foot Crossing in Longford Lane. | Cycleway: Infrastructure cycleways |
114590 | ![]() | A Shared Use Bicycle and Foot Crossing. | Cycleway: Infrastructure cycleways |
112040 | ![]() | Turnpike House in Gloucester Road in Tewkesbury. There is no Segregated Bicycle Path or Cycleway here unlike in Kingsholm Road in Gloucester. Neither is there a Segregated Bicycle Path all the way to Gloucester. | Other: Infrastructure general |
111484 | ![]() | Old bikes are among the amazing collection of bric a brac at the National Trust's Snowshill Manor. Shame there are no cycle stands in the car park then. | Bicycle: Problem bicycles |
86768 | ![]() | Not Sheffield stands but a barrier to cycling onto the platform at Ashchurch station | General sign/notice: Infrastructure signs |
86767 | ![]() | Cycle parking at Ashchurch station. The footbridge gives level access to the southbound platform. | Cycle parking: Infrastructure cycleparking |
85885 | ![]() | The cycling conditions were near perfect along the Severn flood plain on this summer day. Here, on ncn 45, is Chaceley's church, which is just a stone's throw from the Severn's right-bank and the village's riverside pub. | Road environment: Misc road |
84311 | ![]() | National Cycle Route 41 runs across the grass here, completely unmarked. Possibly the least developed stretch of National Cycle Network in the country. Photo #84310 is from the same spot, looking in the opposite direction. | Track: Infrastructure track |
84310 | ![]() | National Cycle Route 41 runs through this gate and along the edge of the field. Photo #84311 is from the same spot, looking in the opposite direction. | Track: Infrastructure track |
58638 | ![]() | An 'Except cycles' plate on a no-through road. (With two "no-through road" signs for some reason...) | General sign/notice: Good practice signs |
53537 | ![]() | Parking on cycle route. Gloucester Business Park, Brockworth | Obstruction: Problem obstructions |