Category: | Cycleway: Other (infrastructure-related) |
Tags: | ncn41 |
Date time: | 3.31pm, Wednesday 29th April, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | frankadam |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Tewkesbury |
Social Distancing with the Coronavirus Covid-19 means that more space is needed for people. The Shared Use Bicycle Path in Churchdown gets narrow at the junction because of the left hand traffic filter lane.
Comments reflect the views of the original submitter only.